Category: News Releases

2,000-cubic-yard concrete pour set to take place at the Red Rock Hydroelectric Project

Work resumes on intake structure at Red Rock Hydroelectric Project

High water levels at Lake Red Rock near Pella, Iowa, have subsided and on June 13, Missouri River Energy Services (MRES) authorized upstream work to resume on the Red Rock Hydroelectric Project (RRHP).

Red Rock Hydroelectric Project Powerhouse Components Start to Take Shape

The landscape at the Red Rock Hydroelectric Project (RRHP) near Pella, Iowa is changing quickly now that powerhouse construction is under way.

Controlled Flooding Causes Suspension of Upstream Work at Red Rock Hydroelectric Project

​Missouri River Energy Services (MRES), on May 25, authorized a controlled flooding of the upstream cofferdam and intake structure excavation at the Red Rock Hydroelectric Project (RRHP).

​MBPP and Wyoming Reach Settlement with EPA on Regional Haze​

A final settlement was signed by the EPA April 20 in a lawsuit brought by the Missouri Basin Power Project (MBPP) and the State of Wyoming against the U.S. Environmental Protection Agency (EPA) concerning emissions of nitrogen oxides (NOX) from MBPP's Laramie River Station in Wheatland, Wyo.


Back to top